Location:

Environment:

Sector:

Quantity/Coverage:

Systems:

Thermoforming:

Project Duration:

PVC Trim or Weld:

Cardiff, Wales

throughout the school

Education

2500m²

AM-Clad and AM-Guard

Yes

2 months

PVC Trims

Over 2,500 square metres of AM-Clad wall cladding and AM-Guard Antimicrobial Wall Protection was installed at the new build £65m Fitzalan High School in Cardiff.

Our systems were specified by Kier Construction throughout the state-of-the-art school where easy clean, impact-resistant and hygienic surfaces were required.

As seen in the photographs, our systems were installed in main corridors, stair wells, science labs, canteen kitchens, changing rooms for the pool and gymnasium, WCs and showers.

AM-Guard’s textured surface is 20 times more scratch-resistant than standard PVC sheets. As well as protecting the high traffic corridor and staircase walls against scuffs and dents, its active antimicrobial performance also boosts the school’s hygiene and infection control standards.

AM-Clad white PVC wall panels were used in the school kitchen and turquoise panels were used in the changing rooms. Corners were thermoformed to achieve the best possible finishes and avoid creating vulnerable joints and seams.

Let’s Talk

When planning your next hygienic upgrade project, you can trust AM-Clad to help you meet your specifications with our advanced PVC wall cladding systems.

Call the AM-Clad team today on 01274 020 331 or email [email protected] and outline your requirements.